Forge Island courtyard dug up again
FOR the second time in less than 12 months major work is taking place along the middle of the Forge Island pedestrian area.
The paved precinct between Arc Cinema, Vetro Lounge and Sygnature Dish restaurant has been dug up – either side and including the drainage ditch – from the Bailey Bridge which leads to Corporation Street across to the steps down to the canal path.


Previous work had altered the gradient of the precinct so rain water ran off into the drain running through the centre of the area.
The council have been contacted about what work is taking place and how long it will be until the area is returned to normal.